Agencies » Minneapolis Metro
Buses will replace METRO Green Line trains between Target Field and West Bank stations during the following periods:
July 1 – 26
Aug. 16 – 19
Note: Green Line customers can transfer to a Blue Line bus at West Bank Station to continue west into downtown Minneapolis or south toward Mall of America. This transfer option will remain available July 27 – Aug. 15 when Green Line service resumes in downtown Minneapolis. Customers traveling east to St. Paul should exit the replacement bus at West Bank station and board the Green Line train.
The replacement bus service for the Green Line is part of a larger maintenance period for the METRO Blue Line.
Buses will be replacing METRO Blue Line trains starting June 29 between Target Field and Mall of America stations. Work includes upgrades to signals and other equipment that guide Metro Transit’s light rail train movements. The upgrades will allow safer and more efficient routing of trains, reducing delays, and improving schedule reliability.
Replacement Blue Line bus service will operate during these dates and between these stations:
June 29 – Aug. 19: Target Field and Mall of America stations (Full Blue Line)
NOTE: Replacement bus timing can vary and trips take longer because of needed routing and traffic conditions.
Please plan extra time for your trip.
Train service will resume on Thursday, Aug. 20.
Subscribe to the "Blue Line Bus" option to receive alerts about replacement bus service during the Track & Signals - Phase 2 maintenance project. Subscribe or update your current subscriptions now!
https://www.metrotransit.org/alertsregister
Visit metrotransit.org/closure for more information and maps for bus boarding locations.
Shown Tue Jun 30 to now
- Click on the dots to get a link to the trip path for that trip.
- Zoom with mouse wheel or two figures and drag to scroll.
- Click on the legend to hide or show individual vehicles or "Hide all" or "Show all" below.
- Dot size indicates load, where available.