•  85-Millwood Stop Map

 
Map
 

Leaflet | Map data © OpenStreetMap contributors

Stop closure Sackville Dr After Beaver Bank Rd (9037) is closed for construction Started Until Sat Aug 22
Stop Closure Notice
Routes: 85 Millwood Inbound
Date Effective: Monday, August 17, 2026 03:00
Location: Sackville Dr After Beaver Bank Rd (9037)
Cause: Stop Closed Construction

Affected Stops:
Sackville Dr After Beaver Bank Rd (9037)
Route 185, 85, 88 schedule to depart at Monday, August 17, 2026 06:25 from Sackville Terminal Bay 4 (8960) ... Started Until
Halifax Transit Service Update: 185, 85, 88 Inbound, Outbound is significantly delayed. A helper bus will be available at Sackville Terminal Bay 4 (8960) starting at Monday, August 17, 2026 06:25
Stop closure Sackville Dr At Civic 791 (7318) is closed for construction Started Sat Aug 15 Until Sat Aug 22
Stop Closure Notice
Routes: 85 Millwood Inbound
Date Effective: Saturday, August 15, 2026 03:00
Location: Sackville Dr At Civic 791 (7318)
Cause: Stop Closed Construction

Affected Stops:
Sackville Dr At Civic 791 (7318)
Route 185, 85, 9A Inbound, Outbound trip departing at Monday, August 17, 2026 05:15 from Burnside Transit C... Started Until
Route 185, 85, 9A Inbound, Outbound departing at Monday, August 17, 2026 05:15 from Burnside Transit Center arriving at Monday, August 17, 2026 08:25 Burnside Transit Center is cancelled