Houston METRO

 •  028-Ost - Wayside

 
Map
 
Routes 004 Beechnut, 028 OST - Wayside, 060 Cambridge and 087 Sunnyside detoured from 8:00 AM to 12:00 PM on Sun Apr 26 due to March For Babies. Starts Sun Apr 26 Until Sun Apr 26
4 Beechnut - E/B – Via Pressler St | R- Bertner St | L- East Rd (stop sign pass OST) L- Cambridge St | R- Holcombe Blvd | L- Almeda Rd | R- S. McGregor Way to regular route.
4 Beechnut - W/B – Via S. McGregor Way | L- Almeda Rd | R- Holcombe Blvd | L- Cambridge St | R- East Rd | R- Bertner St | L- Pressler St to regular route.
28 OST/Wayside - E/B – Via Cambridge St | R- Lamar Fleming St | R- Moursund to regular route – Part Two – from TMC – Via Pressler St | R- Bertner St | L-East Rd (stop sign past OST) | L-Cambridge St | R- OST to regular route.
28 OST/Wayside – W/B – Via OST | L- Cambridge St | R- East Rd | R- Bertner St | L- Pressler St to regular route.
60 Cambridge – N/B – Via Cambridge St | L- East Rd | R- Bertner St | L- Pressler St to regular route.
60 Cambridge – S/B - Via Pressler St | R- Bertner St | L-East Rd (stop sign past OST) | R- Cambridge St to regular route.
87 Sunnyside S/B – Via Pressler St | R- Bertner St | L-East Rd (stop sign past OST) | L- Cambridge

Leaflet | Map data © OpenStreetMap contributors

Route 028 OST - Wayside detoured at Old Spanish Trail @ Scott due to construction. Started Tue Feb 17
**28 OST/Wayside N/B (Southeast TC)**

Via OST
R- Scott St
L- Scottcrest St
R- into Southeast TC
** Leaving Southeast TC **
L- Scottcrest St
R- Scott St
R- Griggs Rd
L- OST
To regular route

--------

**28 OST/Wayside S/B (Southeast TC) **

Via OST
L- Scott St
L- Scottcrest St
R- into Southeast TC
** Leaving Southeast TC **
L- Scottcrest St
R- Scott St
L- OST
To regular route
Route 028 OST - Wayside detoured until further notice due to construction. Started Tue Mar 3

28 OST/Wayside S/B (Southeast TC)
Via OST
L- Scott St
L- Scottcrest St
R- into Southeast TC
** Leaving Southeast TC **
L- Scottcrest St
R- Scott St
L- OST
To regular route
E.T.C. - T.B.D.

28 OST/Wayside N/B (Southeast TC)
Via OST
R- Scott St
L- Scottcrest St
R- into Southeast TC
** Leaving Southeast TC **
L- Scottcrest St
R- Scott St
R- Griggs Rd
L- OST
To regular route
E.T.C. - T.B.D.

Route 028 OST - Wayside detoured through Mon Apr 27 due to construction at Bertner and Old Spanish Trail. Started Until Tue Apr 28
Affected stops:
Bertner Ave @ Old Spanish Trail

E/B Via Bertner
L East Rd
L Cambridge
R OST to regular route.

W/B Via OST
L Cambridge
R East Rd ( Entrance 52)
R Bertner to regular route.
Routes 28 OST - Wayside and 270 Missouri City P&R detoured Friday, April 24, through Monday, April 27 due to construction between Bertner St and Robertson Rd. Started Until Mon Apr 27
28 OST/Wayside - E/B – Via Bertner St | L- East Rd | L- Cambridge St | R- Old Spanish Trail to regular route.
28 OST/Wayside – W/B – Via Old Spanish Trail | L- Cambridge St | R- East Rd | R- Bertner St to regular route.

272 Missouri City P&R - I/B – Via Bertner St | L- East Rd | L- Cambridge St | R- Old Spanish Trail to regular route.
272 Missouri City P&R - O/B - Via Old Spanish Trail | L- Cambridge St | R- East Rd | R- Bertner St to regular route.