Current time: Refresh

 •  3-Sandstone/Elbow Dr SW Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 8137 20701 days 15:03:55 ahead of going ↑Centre St N
at Laycock DR on NB Centre ST N Last Seen at Feb 25 1970

Vehicle 8259 4:16 behind going ↑Centre St N
aprchg 7 AV SW on NB 4 ST SW

Vehicle 8275 7:53 behind going ↑Centre St N
at Sandstone Terminal on NB

Vehicle 8293 3:03 ahead of going ↓Elbow Drive
aprchg 14 AV SW on SB 4 ST SW

Vehicle 8310 3:50 behind going ↓Elbow Drive
at 43 AV N on SB Centre ST N

Vehicle 8665 20701 days 15:05:14 ahead of going ↓Elbow Drive
past 56 AV SW on SB Elbow DR Last Seen at Feb 25 1970

Vehicle 8666 20701 days 15:08:07 ahead of going ↑Centre St N
past 54 AV SW on NB Elbow DR Last Seen at Feb 25 1970

Missing vehicles

Scheduled to be at Berwick WY NW on EB Beddington BV going to ↓Elbow Drive.

Leaflet | Map data © OpenStreetMap contributors


Starting Saturday, October 31 at 7 a.m. through Sunday, November 1 at 5 p.m., lane closures will be in effect on 4 Street S.W. at 15 Avenue S.W. for utility work. Routes 3, 15 and 17 will have a stop closure.


The following stop will be temporarily closed:



  • SB 4 ST SW @ 15 AV SW - near side temporary stop (established in lieu of stop #7307)


Please use the following stop in lieu of the closed stop:



  • SB 4 ST SW @ 14 AV SW - near side temporary stop

Started Until Sun Nov 1

Starting on Tuesday, October 27, and continuing until Friday, April 30, there will be closures on southbound 4 Street S.W. at 14 Avenue S.W. Routes 3, 15 & 17 will be affected.

The following stop will be temporarily closed:


  • SB 4 ST SW @ 14 AV SW (#7307)

Please use the following temporary stop in lieu of the closed stop:


  • SB 4 ST SW @ 15 AV SW (near side)
Started Tue Oct 27 Until Fri Apr 30 2027

Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31