Current time: Refresh

 •  38-Brentwood Station/Temple Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User


On Tuesday, July 28 between 9 a.m. - 3 p.m., there will be a lane closure on eastbound Temple Drive N.E. at 58 Street N.E. to accommodate utility work. Route 38 will have a stop closure.

The following stop will be temporarily closed:


  • WB Temple DR @ Templemont DR NE (#4496)

Please use the following temporary stop in lieu of the closed stop:


  • WB Temple DR @ Templemont DR NE (near side, 65m east of the closed stop)
Started Until

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 8121 3:27 behind going North Crosstown Brentwood Station
at 52 ST NE on WB 44 AV NE

Vehicle 8151 3:33 behind going North Crosstown Brentwood Station
at Brentwood LRT Station

Vehicle 8191 3:36 ahead of going North Crosstown Brentwood Station
at 14 ST NW on WB Northmount DR

Vehicle 8284 0:59 behind going Temple
past 14 ST NW on EB Northmount DR

Vehicle 8290 7:07 behind going North Crosstown Brentwood Station
past 32 ST NE on WB 32 AV NE

Vehicle 8326 2:33 ahead of going Temple
at 23 ST NE on EB 32 AV NE

Vehicle 8341 2:26 behind going Temple
at Whiteram WY on EB 44 AV NE

Leaflet | Map data © OpenStreetMap contributors


Starting Monday, July 20 at 9 a.m. through Saturday, August 15 at 3 p.m., eastbound lane closures will be in effect on 41 Avenue @ Edmonton Trail N.E. and southbound lane closures on Edmonton Trail @ 41 Avenue N.E. for concrete work. Routes 4 and 38 will be affected.

The following stops will be temporarily closed:


  • EB 41 AV NE @ Edmonton TR (#9037) - Route 38

  • SB Edmonton TR @ 41 AV NE (#7298) - Route 4


Please use the following stop in lieu of the closed stop:


  • Route 38 : EB 41 AV NE @ Edmonton TR - 70m west of the closed stop (streetlight post)

  • Route 4 : SB Edmonton TR NE @ 40 AV NE - farside

Started Mon Jul 20 Until Sat Aug 15

Starting Monday, June 29 through Monday, August 3, from 9 a.m. to 3 p.m. daily, the westbound right lane on 32 Avenue N.E. between Barlow Trail N.W. and  will 15A Street N.E. will be closed for construction. Route 38 will have a stop closure.


The following stop will be temporarily closed:



  • WB 32 AV N.E. @ 19 ST N.E. (#6388)


Please use the following stop in lieu of the closed stop:



  • WB 32 AV N.E. @ 19 ST N.E. - temporary stop, 165m west of the closed stop (farside of driveway access)

Started Mon Jun 29 Until Mon Aug 3

Starting Wednesday, July 22 through Wednesday, July 29, routes 38, 43 and 555 will have a stop closure.


The following stop will be temporarily closed:



  • NB 36 ST N.E. @ 32 AV N.E. (#7579) - Routes 38, 43, 555


Please use the following stop in lieu of the closed stop:



  • Temporary Stop - 50m north of the NB 36 ST N.E. @ 32 AV N.E. (#7579)

Started Wed Jul 22 Until Wed Jul 29

Starting Wednesday, July 22 through Wednesday, July 29, routes 38 and 43 will have stop closures.


The following stops will be temporarily closed:



  • SB 36 ST N.E. @ Whitehorn DR (#7578) - Routes 38 and 43

  • SB 36 ST N.E. @ 32 AV N.E. (#7577) - Route 43


Please use the following stop in lieu of the closed stop:



  • Temporary Stop - 45m south of the SB 36 ST N.E. @ Whitehorn DR (#7578) closed stop

  • Temporary Stop - 85m south of the SB 36 ST N.E. @ 32 AV N.E. (#7577) closed stop

Started Wed Jul 22 Until Wed Jul 29