Current time: Refresh
Agencies » Calgary Transit
• 4-Huntington
Remove ads by becoming a Premium User
Vehicle 8050 0:55 ahead of going Huntington
past 6 ST SW on WB 6 AV SW Last seen 1:13
Vehicle 8172 3:20 behind going Huntington
past Northmount DR NW on NB Cambrian DR Last seen 1:11
Vehicle 8247 1:29 behind going Huntington
past 30 AV NE on SB Edmonton TR Last seen 1:09
Vehicle 8230 6:33 behind going Huntington
at 78 AV NW Terminal on EB Last seen 1:14
Missing vehicles
Scheduled to be at Huntridge HL NE on EB 78 AV NE going to Huntington.
Starting Friday, April 25 at 4 a.m. through Wednesday, July 2 at 11:59 p.m., the right-hand lane on 6 Avenue S.W. between 1 Street S.W. and Centre Street S will be closed for construction. Routes 1, 2, 3, 4, 17, 70, and 101 will have stop closures.
The following stops will be temporarily closed:
- WB 6 AV SW @ 1 ST SW (#5115) - Routes 2 & 4
- WB 6 AV SW @ E. of 1 ST SW (#6334) - Routes 1, 3, 17 & 101
- WB 6 AV SW @ E. of 1 ST SW (#6323) - Route 70
Please use the following stops in lieu of the closed stops:
- WB 6 AV SW @ 2 ST SW (#5178) - Routes 1 & 3
- WB 6 AV @ 1 ST SE (#2234) - Route 1
- WB 6 AV SE @ 1 ST SE (#7466) - Routes 4 & 101
- SB Centre ST S @ 4 AV S (#6669) - Routes 2, 3 & 17
- WB 6 AV SW @ 2 ST SW (#5118 - Temporary Near-side Stop) - Routes 2, 4, 17 & 101
- WB 6 AV SW @ 70m W. of 1 ST SW (Temporary Stop) - Route 70