Current time: Refresh

 •  9A-Greystone Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 724 1:01 ahead of going ↑9a Downtown Via Spring Garden Many Seats Load: 20%
at McIntosh St on Herring Cove Rd

Vehicle 1201 14:30 behind going ↓9a Greystone- Fotherby Via Mumford Many Seats Load: 40%
at Brighton Ave on Herring Cove Rd

Vehicle 1235 4:04 behind going ↓9a Greystone- Fotherby Via Mumford Many Seats Load: 20%
aprchg Veterans Memorial Ln on Summer St

Vehicle 1244 3:35 ahead of going ↓9a Greystone- Fotherby Via Mumford
aprchg Duke St Bay 5 on Barrington St

Vehicle 1339 3:58 behind going ↑9a Downtown Via Spring Garden Many Seats Load: 20%
at Barrington St on Spring Garden Rd

Vehicle 1386 3:59 behind going ↑9a Downtown Via Spring Garden Many Seats Load: 40%
at McMullen Rd on Herring Cove Rd

Leaflet | Map data © OpenStreetMap contributors

Stop Closure - Herring Cove Rd After Auburn Ave (6875) is closed for Construction Started Tue Feb 17 2026 Until Wed Jan 1 3000
Stop Closure Notice
Date Effective: Immediate
Stop Location: Herring Cove Rd After Auburn Ave (6875)
Routes affected: 9A, 9B
Direction: Inbound
Cause: Construction

Effect: Other: .Stop Closed
Cause: Construction