Current time: Refresh
Agencies » Los Angeles Metro
• Metro C Line
Remove ads by becoming a Premium User
Vehicle 1222 0:45 behind going ←LAX / Metro Transit Center
past Willowbrook - Rosa Parks Station - Metro C-Line Vehicle History trip path
| 1222 | 1223 |
Vehicle 1220 7:36 ahead of going ←LAX / Metro Transit Center
at Norwalk Station Vehicle History trip path
| 1220 | 1227 |
Vehicle 1218 8:36 ahead of going →Norwalk Station
at LAX / Metro Transit Center Vehicle History trip path
| 1218 | 1224 |
Vehicle 1217 0:15 behind going →Norwalk Station
past Crenshaw C-Line Station Vehicle History trip path
| 1217 | 1221 |
From Open to 9pm, C and K Line trains will run every 13 minutes due to maintenance. This change is necessary to enable rehabilitation of the overhead power system along the original C Line alignment.