Current time: Refresh
• E-Union Station to RidgeGate Parkway Station Vehicle Location Map
Remove ads by becoming a Premium User
Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen
Vehicle 315 1:02 behind going ↑E-Line Union Station
aprchg Broadway Station on I-25 Last seen 12:02
Vehicle 327 1:05 behind going ↓E-Line Ridgegate
aprchg Osage Station on 10th Last seen 23:08
Vehicle 484 1:22 behind going ↑E-Line Union Station
at Belleview Station Last seen 43:17
Vehicle 123,136 0:26 ahead of going ↑E-Line Union Station
aprchg Sky Ridge Station Last seen 1:02
Vehicle 202,301 13:39 behind going ↓E-Line Ridgegate
aprchg Sky Ridge Station Last seen 1:00
Vehicle 215,277 0:27 behind going ↓E-Line Ridgegate
aprchg Broadway Station Center Track on I-25 Last seen 2:41
Vehicle 228,312 0:53 ahead of going ↓E-Line Ridgegate
aprchg Ball Arena / Elitch Gardens Station Last seen 1:03
Vehicle 241,245 7:10 behind going ↓E-Line Ridgegate
aprchg Dry Creek Station Last seen 1:01
Vehicle 253,286 4:20 behind going ↑E-Line Union Station
past Colorado Station Last seen 1:02
Vehicle 275,315 1:03 behind going ↑E-Line Union Station
at Empower Field at Mile High Station Last seen 1:21
Vehicle 312,484 1:27 ahead of going ↓E-Line Ridgegate
aprchg Union Station Track 12 Last seen 3:51
Vehicle 319,348 0:56 behind going ↑E-Line Union Station
at Orchard Station Last seen 1:17
Vehicle 327,338 0:01 ahead of going ↓E-Line Ridgegate
aprchg Belleview Station Last seen 1:03
Affected northbound trips on E Line:
10:40 pm from Ridgegate Parkway Station
Affected northbound trips on R Line:
10:45 pm from Ridgegate Parkway Station
Affected northbound trips on T Line:
10:58 pm from Lincoln Station
RTD is coordinating with local partners Goldsmith Metropolitan District and the City of Greenwood Village to ensure customer access to light rail during a six-month project to redevelop the green space at Orchard Station Park beginning March 26. Light rail service will not be affected by the project.
During the initial phase of work, which includes construction of a sound wall along I-25, crews will work to minimize disruptions and maintain access whenever possible. The park will be closed during the second phase, which includes improvements to landscaping and walkways and creation of a new pond and seating area.
While the project is underway, light rail customers can follow posted detours around the perimeter of the construction site to travel to and from the Orchard Station pedestrian bridge.