Current time: Refresh
Agencies » Spokane STA
• 25-Division
Remove ads by becoming a Premium User
Detour on Route T 12. LOOP from Plaza Bay 9 to 1st @ Bernard for construction.
Detour Instructions: 1ST BETWEEN STEVENS & WASHINGTON CLOSED
FOR TURNBACKS FROM 1ST & STEVENS:
R- STEVENS
L- 3RD
L- WASHINGTON
R- 1ST
TO 1ST & BERNARD LAYOVER
Closed Stops:
Alternate Stops:
Detour on Route T 28. LOOP from Plaza Bay 12 to 1st @ Bernard for construction.
Detour Instructions: 1ST BETWEEN STEVENS & WASHINGTON CLOSED
FOR TURNBACKS FROM 1ST & STEVENS:
R- STEVENS
L- 3RD
L- WASHINGTON
R- 1ST
TO 1ST & BERNARD LAYOVER
Closed Stops:
Alternate Stops:
Detour on Route 11 LOOP from Howard @ Boone to Howard @ Boone for construction.
Detour Instructions: FROM HO-BO LAYOVER
R-BOONE
L-MONROE
RESUME
Closed Stops:
Alternate Stops:
Vehicle 2661 50:47 ahead of going ↓Downtown
aprchg Plaza Bay 13
Vehicle 2961 3:09 ahead of going ↓Downtown
aprchg Main on Stevens
Vehicle 1862 0:12 behind going ↓Downtown
aprchg Cascade on Division
Vehicle 1865 Waiting 9:20. 5:05 ahead of going ↓Downtown
at Hastings Park & Ride Bay 3
Leaflet | Map data © OpenStreetMap contributors