Started Wed Nov 4
Refunds have been issued, which may take a few days to process and be reflected in accounts.
If you do not receive the refund in the coming days, please reach out to 604.398.2042.
We apologize for any inconvenience this has caused.
Effect: Other: TECHNICAL
Cause: Technical Problem: TECHNICAL_ISSUES
Some transfers may be required at Braid Station to continue towards Production Way-University Station.
Frequency daily until 9:30 PM:
Expo Line trains between Waterfront Station and Braid Station will operate every 6 minutes.
Expo Line trains to and from Production Way station will operate every 12 minutes.
After 9:30 PM Expo Line trains to and from Production Way station will operate every 12 minutes. Trains will no longer terminate at Braid Station.
Expo Line trains between Waterfront Station and King George Station will operate at regular frequency on all days.
Millennium Line and Canada Line are unaffected.
Construction work is anticipated to be completed allowing regular SkyTrain service to resume in summer 2027.
Read more at:
Effect: Modified Service: PLATFORM_CHANGE
Cause: Construction
Route: 30053
Temporary stop is located east at designated TransLink wrapped traffic cone.
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 320-Langley/Fleetwood/Surrey Central Station, 395-Langley Centre/King George Station, 502-Fraser Hwy
Stop closures effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: 9-Broadway
Stop closures effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: 9-Broadway
Affected stops:
50875 Broadway-City Hall Station @ Bay 1
Stop closures effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: 99-Broadway B-Line
Stop cancellations effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash)
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: 99-Broadway B-Line
Affected stops:
50875 Broadway-City Hall Station @ Bay 1
Stop closures effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: N9-Broadway-Lougheed
Stop cancellations effective July 16
Cancelled stop: #50924 (WB W Broadway FS Ash St)
New Stop: #58269 (WB W Broadway NS Ash
Cancelled Stop: #50875 (EB W Broadway FS Cambie St)
New Stop: #60535 (EB W Broadway FS ASH St)
Cancelled Stop: #61027 (NB Cambie St FS W 10th Ave)
New Stop: #60676 (NB Cambie St NS W 10th Ave)
Effect: Detour
Cause: Construction
Route: N9-Broadway-Lougheed
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 14-Hastings/Ubc Exchange, 16-29th Avenue Station/Arbutus, 50-Waterfront Station/False Creek South
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 116-North Fraser Way
Affected stops:
54701 Westbound Mathers Ave @ 24 St
54702 Southbound 25 St @ Mathers Ave
54703 Southbound 25 St @ Kings Ave
Effect: Detour
Cause: Construction
Route: 252-Inglewood/Park Royal
Affected stops:
54620 Westbound Marine Dr @ 23 St
54621 Westbound Marine Dr @ 24 St
Effect: Detour
Cause: Construction
Route: 255-Dundarave/Capilano University
Affected stops:
54620 Westbound Marine Dr @ 23 St
54621 Westbound Marine Dr @ 24 St
Effect: Detour
Cause: Construction
Route: 250-Horseshoe Bay/Dundarave/Vancouver
Affected stops:
54592 Eastbound Marine Dr @ 25 St
Effect: Detour
Cause: Construction
Route: 250-Horseshoe Bay/Dundarave/Vancouver
Affected stops:
54592 Eastbound Marine Dr @ 25 St
Effect: Detour
Cause: Construction
Route: 255-Dundarave/Capilano University
Affected stops:
58385 Eastbound Goring St @ Douglas Rd
58342 Holdom Station @ Bay 1
Effect: Detour
Cause: Construction
Route: 136-Lougheed Station/Brentwood Station
Excluding Sundays.
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 104-22nd St Station/Annacis Island
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 560-Murrayville/Langley Centre
Monday to Saturday only.
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 228-Grand Blvd
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 25-King Edward, 123-Canada Way, 130-Willingdon
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 182-Moody Centre Station/Belcarra
Ladner Tree Lighting Festival
Affected stops:
58257 Eastbound 48 Ave @ Laidlaw St
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 616-Ladner South/Ladner Exchange
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 3-Main, 8-Fraser, 19-Kingsway, 22-Knight, N19-Kingsway, N8-Fraser
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 601-Bridgeport Station/South Delta, 602-Bridgeport Station/Tsawwassen Heights
Special Event: Parade of Lights Cloverdale
Affected stops:
59590 Eastbound 58 Ave @ 176 St
55982 Eastbound 58 Ave @ 176A St
55269 Northbound 177B St @ 58 Ave
55270 Northbound 177B St @ 59A Ave
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 320-Langley/Fleetwood/Surrey Central Station
Special Event: Parade of Lights Cloverdale
Affected stops:
55338 Westbound 60 Ave @ 180 St
60661 Westbound 60 Ave @ 179 St
55339 Southbound 177B St @ 59A Ave
55340 Southbound 177B St @ 58A Ave
59591 Westbound 58 Ave @ 177B St
59795 Westbound 58 Ave @ 176A St
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 320-Langley/Fleetwood/Surrey Central Station
Special Event: Parade of Lights Cloverdale
Affected stops:
59590 Eastbound 58 Ave @ 176 St
55982 Eastbound 58 Ave @ 176A St
55258 Southbound 177B St @ 56A Ave
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 342-Langley Centre/Newton Exchange
Special Event: Christmas Light Up Parade
Affected stops:
55342 Northbound 177B St @ Hwy 10
55268 Northbound 177B St @ 57 Ave
59591 Westbound 58 Ave @ 177B St
59795 Westbound 58 Ave @ 176A St
59879 Southbound 175 St @ 58A Ave
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 342-Langley Centre/Newton Exchange
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 50-Waterfront Station/False Creek South
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 50-Waterfront Station/False Creek South
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 345-152 Street, 375-152 Street
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 321-King George Blvd
Bus will service all stops on reroute
A temporary stop also located on NB 140 St farside Green Timbers Way
Affected stops:
55706 Northbound 140 St @ 96 Ave
55707 Northbound 140 St @ Fraser Hwy
Effect: Detour
Cause: Construction
Route: 325-140 Street
Bus will service all stops on reroute
Affected stops:
55721 Southbound 140 St @ Fraser Hwy
Effect: Detour
Cause: Construction
Route: 325-140 Street
Bus will service all stops on reroute
A temporary stop #55741 has been set up at EB 96 @ 139 St until December 12
Affected stops:
62012 Eastbound Fraser Hwy @ 140 St
Effect: Detour
Cause: Construction
Route: 345-152 Street
Bus will service all stops on reroute
A temporary stop #55741 has been set up at EB 96 @ 139 St until December 12
Affected stops:
62012 Eastbound Fraser Hwy @ 140 St
Effect: Detour
Cause: Construction
Route: 395-Langley Centre/King George Station
Bus will service all stops on reroute
Affected stops:
55706 Northbound 140 St @ 96 Ave
56420 Westbound Fraser Hwy @ Whalley Blvd
Effect: Detour
Cause: Construction
Route: 345-152 Street
Bus will service all stops on reroute
Affected stops:
55706 Northbound 140 St @ 96 Ave
56420 Westbound Fraser Hwy @ Whalley Blvd
Effect: Detour
Cause: Construction
Route: 395-Langley Centre/King George Station
Bus will service all stops on reroute
Affected stops:
55706 Northbound 140 St @ 96 Ave
56420 Westbound Fraser Hwy @ Whalley Blvd
Effect: Detour
Cause: Construction
Route: 502-Fraser Hwy
Bus will service all stops on reroute
Affected stops:
55706 Northbound 140 St @ 96 Ave
Effect: Detour
Cause: Construction
Route: 503-Fraser Hwy Express
Bus will service all stops on reroute
A temporary stop #55741 has been set up at EB 96 @ 139 St until December 12
Affected stops:
62012 Eastbound Fraser Hwy @ 140 St
Effect: Detour
Cause: Construction
Route: 502-Fraser Hwy
Bus will service all stops on reroute
A temporary stop #55741 has been set up at EB 96 @ 139 St until December 12
Affected stops:
62012 Eastbound Fraser Hwy @ 140 St
Effect: Detour
Cause: Construction
Route: 503-Fraser Hwy Express
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 3-Main, 8-Fraser, 19-Kingsway, 22-Knight
Effect: Stop Moved: STOP_MOVE
Cause: Unknown: UNKNOWN_CAUSE
Route: 325-140 Street
Service operating normal route on November 25th
Affected stops:
50639 Southbound Richards St @ W Cordova St
Effect: Detour
Cause: Construction
Route: 10-Granville
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 22-Knight
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: R5-Hastings St, N35-Hastings St
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 49-49th Avenue
Stop will also be closed 8am-8pm Saturdays. Separate alert.
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: R1-King George Blvd, 320-Langley/Fleetwood/Surrey Central Station, 501-Langley Centre/Surrey Central Station
Stop also closed 9am-3pm weekdays Nov 20-Dec 11. Separate alert.
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: R1-King George Blvd, 320-Langley/Fleetwood/Surrey Central Station, 501-Langley Centre/Surrey Central Station
Temporary Stop:
51389 Brentwood Station @ Bay 7
Affected Stops:
61804 Brentwood Station @ Bay 5
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 25-King Edward
Temporary Terminus is located on Lougheed Hwy on the west side of Willingdon Ave.
Affected stops:
61804 Brentwood Station @ Bay 5
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 25-King Edward
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 564-Langley Centre/Willowbrook
Expo Line trains will operate Waterfront <-> King George/Production Way, stopping at Royal Oak platform 2 and Edmonds platform 2 in both directions. Additional short-turn trains will operate Waterfront <-> Metrotown and Edmonds <-> King George / Production Way.
Some trains will dwell longer than normal at Metrotown and 22nd Street Stations.
Trips through Royal Oak Station will be delayed, with the worst affected trips taking approximately 15 minutes longer than normal.
Effect: Reduced Service: PLATFORM_CHANGE
Cause: Maintenance
Route: 30053
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 33-16th & 33rd Avenue
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 335-Newton Exchange/Surrey Central Station, 373-Guildford/Surrey Central Station
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 33-16th & 33rd Avenue
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 180-Moody Centre Station/Lougheed Station
No longer using stop 61649 New Westminster Station @ Bay 2
Effect: Detour
Cause: Unknown: UNKNOWN_CAUSE
Route: 112-12th Street
No longer using stop 61648 New Westminster Station @ Bay 1
Stop 59848 Eastbound Carnarvon @ Quayside Dr is also back in service.
Effect: Detour
Cause: Unknown: UNKNOWN_CAUSE
Route: 103-New West Station/Quayside
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 22-Knight
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 22-Knight
The effective headways during this work are:
Waterfront Station - Bridgeport Station - 10 minutes
Bridgeport Station - Richmond-Brighouse Station - 20 minutes
Bridgeport Station - YVR Airport Station - 20 minutes
Last trains will depart stations approximately 5 minutes later than normal timetable stated times.
Effect: Reduced Service: PLATFORM_CHANGE
Cause: Maintenance
Route: 13686
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 406-Railway Ave
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Will board from 60755 then proceed to 68 Ave roundabout
Affected stops:
60135 Westbound 68 Ave @ 18700 Block
Effect: Detour
Cause: Construction
Route: 372-Clayton Heights/Langley Centre
Affected stops:
58627 Westbound Fraser Hwy @ Fleetwood Way
Effect: Detour
Cause: Construction
Route: 320-Langley/Fleetwood/Surrey Central Station
Affected stops:
58627 Westbound Fraser Hwy @ Fleetwood Way
Effect: Detour
Cause: Construction
Route: 502-Fraser Hwy
Affected stops:
58627 Westbound Fraser Hwy @ Fleetwood Way
Effect: Detour
Cause: Construction
Route: 503-Fraser Hwy Express
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 19-Kingsway, 22-Knight, N19-Kingsway
Affected stops:
58235 Southbound Abbott St @ W Pender St
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 50-Waterfront Station/False Creek South
Affected stops:
58051 Eastbound Keefer Place @ Taylor St
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 50-Waterfront Station/False Creek South
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 183-Moody Centre Station/Coquitlam Central Station, 184-Moody Centre Station/Noons Creek, 160-Port Coquitlam Station/Kootenay Loop, N9-Broadway-Lougheed
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 232-Grouse Mountain/Phibbs Exchange
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 503-Fraser Hwy Express
Affected stops:
58762 Southbound Fraser St @ SE Marine Dr
58647 Westbound SE Marine Dr @ Poplar St
Effect: Detour
Cause: Construction
Route: 8-Fraser
UPDATE: N35 SFU Exchange detour from Wed Nov 4 through Thu Nov 26. Regular route to Hastings St and Sperling St, then Sperling Ave, Curtis St, Duthie Ave, Hastings St, then resume regular route due to road block.
Affected stops:
51852 Eastbound Hastings St @ Sperling Ave
58372 Eastbound Hastings St @ Inlet Dr
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: N35-Hastings St
No stop missed.
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: R5-Hastings St
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: R4-41st Avenue
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 41-41st Avenue
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 14-Hastings/Ubc Exchange, 4-Powell/Ubc Exchange, 7-Nanaimo Station/Dunbar, 10-Granville, 16-29th Avenue Station/Arbutus, 50-Waterfront Station/False Creek South
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 3-Main, 8-Fraser, 19-Kingsway, N19-Kingsway, N8-Fraser
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 41-41st Avenue
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 41-41st Avenue, 49-49th Avenue
Affected stops:
58627 Westbound Fraser Hwy @ Fleetwood Way
Effect: Detour
Cause: Construction
Route: 395-Langley Centre/King George Station
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 410-Brighouse Station/22nd St Station
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 503-Fraser Hwy Express, 502-Fraser Hwy
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 3-Main
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 408-Garden City
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 33-16th & 33rd Avenue, 29-Elliott/29th Avenue Station
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 33-16th & 33rd Avenue
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 28-Boundary
Affected stops:
59940 Westbound Stadium Rd @ West Mall
Effect: Detour
Cause: Other: SPECIAL_EVENT
Route: 68-Ubc Exchange/Wesbrook Village
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 116-North Fraser Way, 147-Metrotown Station/Edmonds Station
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 324-132 Street
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 8-Fraser, N8-Fraser
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 701-Coquitlam Central Station/Haney Place/Maple Ridge E, 791-Haney Place/Braid Station
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 6-Davie
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 3-Main, 4-Powell/Ubc Exchange, 7-Nanaimo Station/Dunbar, 8-Fraser, 10-Granville, 50-Waterfront Station/False Creek South
Effect: Detour
Cause: Construction
Route: 10-Granville
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 310-Scottsdale/Ladner
Effect: Detour
Cause: Construction
Route: 10-Granville
Effect: Detour
Cause: Construction
Route: 103-New West Station/Quayside
Effect: Detour
Cause: Construction
Route: 103-New West Station/Quayside
Effect: Detour
Cause: Construction
Route: 112-12th Street
Effect: Detour
Cause: Construction
Route: 112-12th Street
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 15-Cambie, N15-Cambie
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 19-Kingsway
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Routes: 509-Walnut Grove/Surrey Central Station, 562-Langley Centre/Walnut Grove
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 27-Rupert
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 4-Powell/Ubc Exchange
Effect: Detour
Cause: Construction: ROAD_BLOCK
Route: 4-Powell/Ubc Exchange
Effect: Detour
Cause: Construction
Route: 22-Knight
Effect: Detour
Cause: Construction
Route: 22-Knight
Affected routes:
23
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction
Route: 23-Pacific
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 9-Broadway, 99-Broadway B-Line, N9-Broadway-Lougheed
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Routes: 9-Broadway, 99-Broadway B-Line, N9-Broadway-Lougheed
Effect: Stop Moved: STOP_MOVE
Cause: Construction
Route: 41-41st Avenue
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 14-Hastings/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 14-Hastings/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: TRAFFIC
Route: 240-Lynn Valley/Downtown
Effect: No Service: CANCELLATION
Cause: Other: ON-BOARD_INCIDENT
Route: 375-152 Street
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 410-Brighouse Station/22nd St Station
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 17-Oak
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 17-Oak
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 4-Powell/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 4-Powell/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 14-Hastings/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 14-Hastings/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 14-Hastings/Ubc Exchange
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 373-Guildford/Surrey Central Station
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction: ROAD_BLOCK
Routes: 44-Ubc Exchange/Downtown Express, 250-Horseshoe Bay/Dundarave/Vancouver, 251-Queens/Park Royal, 252-Inglewood/Park Royal, 253-Caulfeild/Vancouver/Park Royal, 255-Dundarave/Capilano University
Effect: Reduced Service: STOP_CLOSURE
Cause: Construction: ROAD_BLOCK
Routes: 44-Ubc Exchange/Downtown Express, 250-Horseshoe Bay/Dundarave/Vancouver, 251-Queens/Park Royal, 252-Inglewood/Park Royal, 253-Caulfeild/Vancouver/Park Royal, 255-Dundarave/Capilano University
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 9-Broadway
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 9-Broadway
Effect: No Service: CANCELLATION
Cause: Other: OPERATIONAL_ISSUE
Route: 9-Broadway
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 136-Lougheed Station/Brentwood Station
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 44-Ubc Exchange/Downtown Express
Effect: No Service: CANCELLATION
Cause: Other: TRAFFIC
Route: 84-4th Avenue Express
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 44-Ubc Exchange/Downtown Express
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 640-River Road
Effect: No Service: CANCELLATION
Cause: Technical Problem: MECHANICAL_ISSUE
Route: 373-Guildford/Surrey Central Station
During those times, Canada Line customers should enter Waterfront via the entrance on Granville at Hastings.
Effect: Unknown: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 13686
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 413-Riverport/Steveston
AddFare is added to the following fare types (including concession fares):
- Single-use tickets and DayPasses purchased from YVR Airport, Sea Island Centre, and Templeton stations
- Compass Card Stored Value trips
- Tap to Pay (e.g., contactless Interac Debit, American Express, Mastercard, and Visa credit cards along with Apple Pay, Google Pay, and Samsung Pay.)
- YVR Airport AddFare is automatically deducted from the contactless card or the Stored Value on a Compass Card.
For more information, including which trips and fare types are exempt from the YVR AddFare, please visit:
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 13686
From July 25, 2026 until February 2027, SkyTrain service between Waterfront and Commercial-Broadway stations will be impacted the following days and times:
-Saturdays from start of service to 10:15 a.m.
-Sundays from start of service to 10:15 a.m. and 9:30 p.m. until the end of service.
Please allow for 20 minutes extra trip time during these periods if traveling downtown.
Check digital screens at station entrances for platform changes. Customers should board the first available train toward their destination and transfer if needed.
For more information please visit TransLink.ca/railreplacement
Millennium Line and Canada Line are unaffected.
Effect: None: INFORMATIONAL
Cause: Construction
Route: 30053
Monday to Friday:
Every 7 to 8 minutes towards Capilano University from 7 a.m. to 7:45 a.m. (from 9 minutes)
Every 4 minutes towards Capilano University from 7:45 a.m. to 8:30 a.m. (from 5 minutes)
Every 5 minutes towards Capilano University from 8:30 a.m. to 9 a.m. (from 6 minutes)
Every 7 to 8 minutes towards Capilano University from 9 a.m. to 10 a.m. (from 10 minutes)
Every 6 minutes towards Capilano University from 2 p.m. to 4 p.m. (from 10 minutes)
Every 6 minutes towards Phibbs Exchange from 4 p.m. to 5 p.m. (from 10 minutes)
To view upcoming schedules for this route, please visit the schedules page.
Effect: Modified Service: SERVICE_CHANGE
Cause: Other: SCHEDULE_ADJUSTMENT
Route: 245-Phibbs Exchange/Capilano University
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 19-Kingsway, N19-Kingsway
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: R1-King George Blvd, 321-King George Blvd, 394-White Rock Centre/King George Station
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 16-29th Avenue Station/Arbutus
Affected routes:
N24
236
240
241
255
881
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 236-Grouse Mountain/Lonsdale Quay, 240-Lynn Valley/Downtown, 241-Upper Lonsdale/Downtown, 255-Dundarave/Capilano University, 881-Carson Graham School Special, N24-Downtown/Lynn Valley
Affected trips:
leaving Newton Exchange @ Bay 8 at 11:10 pm
Effect: Modified Service: SCHEDULE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: R1-King George Blvd
Learn more at TransLink.ca/servicechanges.
Serviced stop:
53038 Westbound Mariner Way @ Dewdney Trunk Rd
Affected stops:
53036 Westbound Dewdney Trunk Rd @ Lougheed Hwy
53037 Westbound Dewdney Trunk Rd @ Norman Ave
Effect: Modified Service: SERVICE_CHANGE
Cause: Construction
Route: 152-Coquitlam Central Station/Lougheed Station
Serviced stop:
53359 Southbound Ranch Park Way @ Norman Ave
Affected stops:
53036 Westbound Dewdney Trunk Rd @ Lougheed Hwy
Effect: Modified Service: SERVICE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: 151-Como Lake Ave
Learn more at TransLink.ca/servicechanges.
Serviced stop:
53038 Westbound Mariner Way @ Dewdney Trunk Rd
Affected stops:
53036 Westbound Dewdney Trunk Rd @ Lougheed Hwy
53037 Westbound Dewdney Trunk Rd @ Norman Ave
Effect: Modified Service: SERVICE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: 153-Coquitlam Central Station/Braid Station
Affected trips:
leaving Surrey Central Station @ Bay 7 at 2:44 pm
Effect: Modified Service: SCHEDULE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: 325-140 Street
Activated Stop:
59530 Westbound Austin Ave @ Schoolhouse St - now located on the east side of the intersection
Cancelled Stops:
58445 Westbound Austin Ave @ Decaire St
58446 Westbound Austin Ave @ Schoolhouse St
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 152-Coquitlam Central Station/Lougheed Station
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 503-Fraser Hwy Express, 556-Langley Centre/Gloucester, 564-Langley Centre/Willowbrook
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 503-Fraser Hwy Express, 556-Langley Centre/Gloucester, 564-Langley Centre/Willowbrook
Effect: None: INFORMATIONAL
Cause: Construction
Route: 405-Five Road/Cambie
Started Mon Nov 16
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 106-6th Street, N19-Kingsway
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 33-16th & 33rd Avenue, 2-Macdonald
Affected trips:
leaving Westbound Russell Ave @ Hospital St at 9:06 am
Effect: Modified Service: SCHEDULE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: 360-Ocean Park/Peace Arch Hospital
Affected trips:
leaving Southbound 128 St @ 16 Ave at 9:28 am
Effect: Modified Service: SCHEDULE_CHANGE
Cause: Unknown: UNKNOWN_CAUSE
Route: 361-Ocean Park/White Rock Centre
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 153-Coquitlam Central Station/Braid Station, 156-Braid Station/Lougheed Station
Effect: None: INFORMATIONAL
Cause: Construction
Routes: 372-Clayton Heights/Langley Centre, 502-Fraser Hwy
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 9-Broadway, N9-Broadway-Lougheed
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 338-East Fraser Heights/Guildford
Effect: None: INFORMATIONAL
Cause: Construction
Routes: 509-Walnut Grove/Surrey Central Station, 562-Langley Centre/Walnut Grove
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Route: 3-Main
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 173-Coquitlam Central Station/Cedar, 174-Coquitlam Central Station/Rocklin, 175-Coquitlam Central Station/Meridian
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: R2-Marine-Willingdon, 130-Willingdon
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 20-Victoria, N20-Victoria
Effect: None: INFORMATIONAL
Cause: Construction
Route: 157-Burquitlam Station/Lougheed Station
Effect: None: INFORMATIONAL
Cause: Construction
Route: 25-King Edward
Affected routes:
N19
4
5
7
19
22
209
210
211
214
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 209-Mountain Hwy, 4-Powell/Ubc Exchange, 5-Robson, 7-Nanaimo Station/Dunbar, 19-Kingsway, 22-Knight, 210-Mountain Hwy Express, 211-Seymour/Phibbs Exchange/Burrard Station, 214-Blueridge/Phibbs Exchange/Burrard Station, N19-Kingsway
Effect: None: INFORMATIONAL
Cause: Unknown: UNKNOWN_CAUSE
Routes: 4-Powell/Ubc Exchange, 19-Kingsway
15 minute frequency extended until the end of service Fri/Sat nights (last sailing from Waterfront 1:22).
In addition: Saturday, December 5 and Saturday, December 12 an additional vessel will provide 10 minute service from 11:00 AM to 7:30 PM to accommodate increased ridership associated with the West Coast Express Santa train, Christmas Night Market, and other festive events. This will be followed by extended 15 minute frequency until the end of service.
Effect: Additional Service: EXTRA_SERVICE
Cause: Other: SPECIAL_EVENT
Route: 6771
Expected to reopen in November.
Customers requiring elevator access must proceed to King Edward or Langara-49th Ave to continue their journey.
Canada Line staff will be present to provide any assistance.
Effect: Accessibility Issue: ELEVATORS
Cause: Construction
Route: 13686
Connections to/from SkyTrain and Burrard Station are available via:
Bus
- Catch the #5 Downtown bus from Burrard Bay 7, across the street from the main station entrance. Disembark at the intersection of Cambie and Dunsmuir streets. From here, travel one block south to Stadium-Chinatown Station.
- Catch the #5 Robson from the intersection of Cambie and Dunsmuir streets, one block northwest from the station entrance. Disembark at Burrard Station Bay 1.
Street level
-Travel along Dunsmuir Street between Burrard and Granville Station’s accessible entrance, located just southeast of Granville Street.
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
To connect to SkyTrain from street level at Royal Oak, catch the #148 Edmonds Station bus from bus stop #59781 on Beresford Street.
To get to street level at Royal Oak from SkyTrain, catch the #148 Royal Oak Station bus from Edmonds Station Bay 7.
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Work to replace the first escalator, serving trains headed to VCC-Clark, will begin July 20 and is expected to be completed in spring 2027.
During the replacement, riders can continue to use the staircase and elevator to access platform level.
Effect: Accessibility Issue: ESCALATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30052
During the replacement, riders can continue to use the staircase and elevator to access platform level.
Effect: Accessibility Issue: ESCALATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30052
To increase accessibility between stations a special shuttle service called Accessible Shuttle will be implemented
This service will run between 29th and Joyce Stations on weekdays (excluding holidays) during peak hours to help customers connect between SkyTrain and bus services.
The shuttle will run approximately every 15 minutes on weekdays during the following hours (excluding holidays and weekends):
• 6 a.m. to 9 a.m.
• 3 p.m. to 6:30 p.m.
Customers traveling from 29th Avenue Station bus loop requiring access to SkyTrain can board the Accessible Shuttle from Bay 2 (Stop #51603) at 29th Avenue Station for a direct connection to Joyce–Collingwood Station and SkyTrain service during shuttle operating hours.
Customers traveling from Joyce–Collingwood Station SkyTrain to bus connections at 29th Avenue Station can board the Accessible Shuttle from Bay 8 (Stop 60285) located on the far-east side of the bus loop at Joyce–Collingwood Station for service to 29th Avenue Station and
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Use the King George Platform 2 elevator when available. Train announcements when arriving at Surrey Central will advise if the elevator at King George is out of service.
Take the R1 RapidBus from Surrey Central to King George from Bay 11.
Customers starting their trip at King George Station can use the King George Platform 2 elevator when available or take the R1 RapidBus (or any other bus) to Surrey Central from Bay 4.
Customers starting their trip at King George Platform 2 should plan up to 20 minutes extra travel time for their train to travel from Platform 2 to Platform 1 before departing towards Waterfront, or for the bus connection to Surrey Central.
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Customers who require elevator access can use the following alternative travel options:
-From Patterson Station, customers can travel east along the BC Parkway to Central Boulevard and Willingdon Avenue, and catch buses #19, #31, #49, #116, or #130 to Metrotown Station.
-Customers can also continue travelling east along the BC Parkway to the accessible entrance at Metrotown Station.
-From Patterson Station, travel north on Patterson Avenue to Kingsway and take the #19 Kingsway bus to the Metrotown Station bus loop
-Customers using the #129 bus can connect to the SkyTrain network at Gilmore Station on the Millennium Line.
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30053
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30053
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30053
Effect: Accessibility Issue: ESCALATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Effect: Accessibility Issue: ELEVATORS
Cause: Unknown: UNKNOWN_CAUSE
Route: 30053
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30053
Affected direction: Westbound
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30052
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30052
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30052
Effect: Accessibility Issue: ESCALATORS
Cause: Maintenance
Route: 30053
Effect: Accessibility Issue: ELEVATORS
Cause: Maintenance
Route: 30052
Effect: Accessibility Issue: ELEVATORS
Cause: Maintenance
Route: 30052
Expected to be back in service this afternoon.
Effect: Accessibility Issue: ELEVATORS
Cause: Maintenance
Route: 13686