Due to detour, inbound stops at Capitol and University, Capitol and Cesar Chavez, and Capitol and River will be closed until further notice. Temporary stop will be placed at Capitol and Boise Ave.
Route: 3-Vista
Due to construction both inbound routes 4 and 5 are on detour. From River, Left on 11th, Right on Myrtle, Left on Capitol. Stop at Capitol and River will be missed. No temp stops placed.
Routes: 61, 62
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Due to road construction, route 16 is on detour. Stops on 1st/Idaho and 1st/Bannock will be closed, use stop on Main and 1st.
Route: 16-VA/15th St
Due to road closure on 8th Street, OB route 10 will be on detour from 5th Street to Fort Street. Stop on 8th and Franklin will be closed, no temp stop placed. Please go to next open stop to catch route 10.
Route: 71
OB route 9 & 10 stop at state and Ellen's Ferry closed. No temp stop placed.
Routes: 9-State Street, 10-Hill Road
Route 5 temporarily stops at 9th & Grove instead of Main Street Station due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 5-Emerald
OB Stop on Overland and Shoshone to TSM is closed, and temp stop placed on far side of the intersection.
Route: 29-Overland
Outbound stop closed on Main and 27th due to construction and temp stop placed far-side of the intersection, right after the entrance to the Gas station.
Route 17 Inbound stop at Idaho and 3rd has been closed. No temp placed.
Route: 17-Warm Springs/Parkcenter
For the outbound routes 2, 16 and 17 stop on Main and 3rd is closed for long term, please use stop on Main and 1st. Thank you.
Routes: 2-Broadway, 16-VA/15th St, 17-Warm Springs/Parkcenter
There is a temp stop in place at Outbound Emerald and Rifleman for the routes 24 and 42.
Routes: 24-Ustick/Maple Grove, 42-Happy Day-Towne Square
All routes that use downstairs at MSS are relocated due to construction. Visit ridevrt.org/MSS25 for more information.
Routes: 29-Overland, 3-Vista, 5-Emerald, 4-Franklin, 10-Hill Road, 16-VA/15th St, 2-Broadway
Route 4 temporarily stops at 9th & Grove instead of Main Street Station due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 4-Franklin
Route 3 temporarily stops at 9th & Grove instead of Main Street Station due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 3-Vista
Route 2 temporarily stops at Main & 8th upstairs instead of Main Street Station downstairs due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 2-Broadway
Route 10 temporarily stops at Main & 8th instead of Main Street Station downstairs due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 10-Hill Road
Route 16 temporarily stops at Main & 8th instead of Main Street Station downstairs due to construction. Visit ridevrt.org/MSS25 for more information.
Route: 16-VA/15th St