• 3-Sandstone/Elbow Dr SW
Starting Saturday, August 29 through Monday, October 19, from 9 a.m. to 3 p.m. on weekdays and 7 a.m. to 7 p.m. on weekends, eastbound 25 Avenue @ 4 Street S.W. will be closed for construction. Route 17 will be detoured. Routes 3 and 15 will have a stop closure.
Outbound route 17 will travel:
- From South on 4 Street S.W.
- East on 26 Avenue S.W.
- North on 2 Street S.W.
- East on 25 Avenue S.W., to regular route
The following stops will be temporarily closed:
- NB 4 ST S.W.@ 25 AV S.W. fs - (#5217) Routes 3, 15 & 17
- EB 25 AV S.W. @ 4 ST S.W. - (#5594) - Route 17
Please use the following stops in lieu of the closed stops:
- NB 4 ST S.W. @ 24 AV S.W. - near side detour stop
- EB 26 AV S.W. @ 4 ST S.W. - far side detour stop - Route 17
Jump to: ↓South
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.