• 89-Lions Park - North Pointe
Starting Thursday, August 13 at 9 a.m. through Monday, August 31 at 6 p.m., there will be construction along Berkshire Boulevard N.W. between 14 Street N.W. and Beddington Boulevard N.W., routes 46, 64, 89 and 118 will have stop closures.
The following stops will be temporarily closed:
- EB Berkshire BV @ 14 ST N.W. (#6329) - Routes 64 and 118
- EB Berkshire BV @ Berkley DR N.W. (#7807) - Routes 64 and 118
- EB Berkshire BV @ Beddington BV N.W. (#6197) - Routes 46 and 89
Please use the following stops in lieu of the closed stops:
- EB Berkshire BV @ 14 ST N.W. - 25m east of the closed stop*
- EB Berkshire BV @ Berkley DR N.W. - 25m east of the closed stop*
- EB Berkshire BV @ Beddington BV N.W. - 25m east of the closed stop*
*Please note: temporary stops are not universally accessible.
Started Until Mon Aug 31Jump to: ↓South
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||