• 712-Beaverbrook/Parkland
Jump to: ↓South
| ||||||
Starting Monday, November 16 at 7 a.m. through Friday, November 20 at 7 p.m., northbound lane closures will be in effect on Fairmount Drive @ Willow Park Drive S.E. for construction. Routes 10, 712, 713, and 715 will be affected.
The following stop will be temporarily closed:
- NB Fairmount DR @ Willow Park DR SE (#5546) - Route 10, 712, 713 and 715
Please use the temporary stop located 37m north from the closed stop.
Started Mon Nov 16 Until Fri Nov 20