• 46-Beddington
Starting on Monday, August 10, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 15, Bermuda Drive N.W. will be closed from Berkshire Road - Bernard Drive N.W. to accommodate construction. Route 46 will be detoured.
Buses will travel:
- From south on Berkshire Road N.W.
- West on Bermuda Drive N.W.
- South on Beddington Boulevard N.W.
- North on Bermuda Road N.W.
- East on Bermuda Drive N.W., to regular route
The following stop will be temporarily closed:
- EB Bermuda DR @ Berkshire RD NW (#6198)
Please use the following temporary stop in lieu of the closed stop:
- WB Bermuda DR @ Berkshire RD NW
Starting Thursday, August 13 at 9 a.m. through Monday, August 31 at 6 p.m., there will be construction along Berkshire Boulevard N.W. between 14 Street N.W. and Beddington Boulevard N.W., routes 46, 64, 89 and 118 will have stop closures.
The following stops will be temporarily closed:
- EB Berkshire BV @ 14 ST N.W. (#6329) - Routes 64 and 118
- EB Berkshire BV @ Berkley DR N.W. (#7807) - Routes 64 and 118
- EB Berkshire BV @ Beddington BV N.W. (#6197) - Routes 46 and 89
Please use the following stops in lieu of the closed stops:
- EB Berkshire BV @ 14 ST N.W. - 25m east of the closed stop*
- EB Berkshire BV @ Berkley DR N.W. - 25m east of the closed stop*
- EB Berkshire BV @ Beddington BV N.W. - 25m east of the closed stop*
*Please note: temporary stops are not universally accessible.
Started Until Mon Aug 31Jump to: ↓South
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Starting at 9 a.m. on Tuesday, July 28, and continuing until 6 p.m. on Friday, August 14, eastbound Beddington Boulevard N.W. will have closures between Bermuda Drive N.W. & Centre Street N. Routes 3, 46 & 64 will have stop closures.
The following stops will be temporarily closed:
- SB Beddington BV @ Berwick DR NW (#5162)
- EB Beddington BV @ Berwick WY NW (#5163)
- EB Beddington BV @ Berkley RD NW (#8622)
- EB Beddington BV @ Berkley DR NW (#6331)
- WB Beddington BV @ Centre ST N (#8634)
Please use the following temporary stops in lieu of the closed stops:
- SB Beddington BV @ Berwick DR NW (25m south of the closed stop)
- EB Beddington BV @ Berwick WY NW (25m east of the closed stop)
- EB Beddington BV @ Berkley RD NW (25m east of the closed stop)
- EB Beddington BV @ Berkley DR NW (25m east of the closed stop)
- WB Beddington BV @ Centre ST N (75m west of the closed stop, far side driveway access)
Starting Wednesday, August 12 at 9 a.m. through Monday, August 31 at 6 p.m., there will be construction along Berkshire Boulevard N.W. between 14 Street N.W. and Beddington Boulevard N.W., routes 46 and 118 will have a stop closure.
The following stop will be temporarily closed:
- WB Berkshire BV @ Sandarac DR N.W. (#7806) - Routes 46 and 118
Please use the following stop in lieu of the closed stop:
- WB Berkshire BV @ Sandarac DR N.W. - 25m west of the closed stop*
*Please note: temporary stop is not universally accessible.
Started Wed Aug 12 Until Mon Aug 31