Agencies » Fairfax Connector
• 310-Franconia-Rolling Valley Line
Route 310EB: Delays (Updated )
Route 310EB: Due to operational issues, this trip is experiencing delays of 5-15 minutes.PF
Route 310EB: Due to operational issues, this trip is experiencing delays of 5-15 minutes.PF
Route 310EB: Missed Trip (Updated )
Route 310EB: Due to mechanical issues, the trip leaving Rolling Valley PNR at 5:20PM was missed.PF
Route 310EB: Due to mechanical issues, the trip leaving Rolling Valley PNR at 5:20PM was missed.PF
Route 310WB: Delays (Updated )
Route 310WB: Due to operational issues, this trip is experiencing delays of 5-15 minutes.PF
Route 310WB: Due to operational issues, this trip is experiencing delays of 5-15 minutes.PF
Route 310WB: Missed Stops (Updated )
Route 310WB: Due to mechanical issues, stops were missed at 6:30PM between Huntington Metro and Franconia Springfield Metro. PF
Route 310WB: Due to mechanical issues, stops were missed at 6:30PM between Huntington Metro and Franconia Springfield Metro. PF
Jump to: →East
|
*5.17.2025 Service Change (Updated )
Beginning 5.17.2025, multiple FFX Connector routes will change, with two new 652& 670 added. Go to https://www.fairfaxconnector.com
Beginning 5.17.2025, multiple FFX Connector routes will change, with two new 652& 670 added. Go to https://www.fairfaxconnector.com