Agencies » Fairfax Connector
• 721-Chain Bridge Road - Mclean
Route 721WB: Delay (Updated )
Route 721WB: Due to operational issues, the trip leaving Langley at 2:46PM is experiencing delays of 5-15 minutes.PF
Route 721WB: Due to operational issues, the trip leaving Langley at 2:46PM is experiencing delays of 5-15 minutes.PF
Jump to: →East
|
Additional Stops:
*5.17.2025 Service Change (Updated )
Beginning 5.17.2025, multiple FFX Connector routes will change, with two new 652& 670 added. Go to https://www.fairfaxconnector.com
Beginning 5.17.2025, multiple FFX Connector routes will change, with two new 652& 670 added. Go to https://www.fairfaxconnector.com