• Kitchener
We have organized an extra eastbound train departing Georgetown GO at 08:56. The train is scheduled to make all stops to Bramalea GO then run express to Union Station. Additional information: Please listen for announcements, spread out along the platform, and be cautious. The yellow line is there for your safety. Please keep yourself, backpacks, bags, and loose clothing well clear of the yellow line. You can use gotracker.ca to check what platform number this train will depart from and to see when this train is expected to arrive at your station stop. Subscribe to On the GO alerts and receive customized, real-time alerts for schedule changes, construction updates and more. Sign up for On The GO alerts here.
Jump to: →East
| ||||||||||||||||||||||||||||
Additional Stops:
The north bus loop at Brampton Transit Terminal is closed due to construction of the underground parking lot. Temporary bus stops have been set up on Main Street. GO bus routes 31 & 33- Eastbound: Stop is located on the west side of Main St. N. – exit to Main St. N, turn left and proceed about 85 metres north.- Westbound: Stop is located on the east side of Main St. N. at Church St. E. – exit to Main St. N., turn left and proceed about 125 metres north toward Church St. E. GO bus route 37- Northbound: Stop is located on the east side of Main St. N., just north of the terminal – exit to Main St. N. and turn left.- Southbound: Route ends on the west side of Main St. N, near the terminal. Additional Information- Accessible parking spaces remain available in the main parking lot.- Work is expected to be completed in August 2026. - Please follow directional signage and use caution around construction areas.
The entrance from the Bay Concourse to the Scotiabank Galleria will be closed Monday to Friday from 22:00 to 6:00 due to construction.Please exit via the north pedestrian bridge or the outdoor route through the Bay South Teamway.
A portion of the main parking lot and one lane in the passenger pick-up and drop-off area are temporarily closed for concrete and repaving work and installation of garbage enclosure. Here’s what you need to know:- 240 parking spaces are temporarily closed. - Please use other available parking lots at this station.- For additional parking, please use Bramalea GO; which is approximately a 20-minute drive from Brampton Innovation District GO.- Work is expected to be completed in Aug. 2026.- Please follow directional signage and use caution around construction areas.