• Lakeshore West
The Union Station 16:20 - West Harbour GO 17:33 train will end at Aldershot GO and the West Harbour GO 18:25 - Union Station 19:45 will begin at Aldershot GO due to a fire investigation. We have organized a GO bus shuttle. For westbound customers travelling to West Harbour GO: At Aldershot GO, buses will board from the bus loop on the north side of the station, next to the station building. Click here to see the GO bus shuttle location. PRESTO card, credit card, mobile wallet, and Interac Debit customers are reminded to tap off at Aldershot GO before boarding the GO shuttle bus. For customers at West Harbour GO travelling eastbound: A GO shuttle bus will board from the bus loop on the south side of the station. Click here to see the GO bus shuttle location.Click here to see the available service at Aldershot GO. Subscribe to On the GO alerts and receive customized, real-time alerts for schedule changes, construction updates and more. Sign up for On The GO alerts here.
The West Harbour GO 18:25 - Union Station 19:45 train will run express from Burlington GO to Union Station because of an earlier fire investigation. The next train making all stops is scheduled to depart Burlington GO at 19:12.Subscribe to On the GO alerts and receive customized, real-time alerts for schedule changes, construction updates and more. Sign up for On The GO alerts here.
The Confederation GO 19:09 - Union Station 20:45 train will start at West Harbour GO because of an earlier fire investigation. GO bus route 11 will hold until 19:10 for customers. Alternatively, the next route 12 GO bus is scheduled to depart Confederation GO at 19:38. Subscribe to On the GO alerts and receive customized, real-time alerts for schedule changes, construction updates and more. Sign up for On The GO alerts here.
Jump to: →East
| ||||||||||||||||||||||||||||
Additional Stops:
Access to the waiting area and restrooms is open Monday – Friday, 5:20 a.m. to 12:40 p.m.After the main waiting area is closed:To exit from the station building to MacNab Street, please use the walkway doors adjacent to the platform 1 staircase.
Ongoing track conditions between Confederation GO and Niagara Falls GO (VIA Station) continue to require trains to operate at reduced speeds through the area. As a result, trips may experience delays of up to 30 minutes while crews work to resolve the issue. Customers are encouraged to allow extra travel time and check their trip before travelling. Subscribe to On the GO alerts and receive customized, real-time alerts for schedule changes, construction updates and more. Sign up for On The GO alerts here. See below for current train status:
From September 19 to October 13, the passenger Pick-Up & Drop-Off area will undergo planned rehabilitation work. The work will be completed in two stages over approximately four weeks.Here’s what you need to know:· Stage 1 – North Two Lanes: September 19 – September 29, 2026: The two north passenger pick up and drop off lanes will be closed to vehicle traffic. The south lane will remain open and accessible to the public for passenger pick up and drop off.· Stage 2 – South Lane: September 30 – October 13, 2026: Once Stage 1 is complete, the configuration will be switched. The south lane will be closed to complete the remaining work, while the two north lanes will be reopened and made available to the public for passenger pick up and drop off.· Please follow all directional signage and use caution when moving around the construction area.· Please allow extra time for pick up and drop off at your station.
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.