• Milton
Environment Canada has forecasted heavy rain for today, severe thunderstorms with the possibility of strong wind gusts and hail. We have personnel patrolling the tracks in advance and during heavy rainfall events to ensure your safety on the rails. At times an inspection may be required for certain parts of affected tracks before trains can proceed safely through the area. Be cautious in parking lots, on platforms and in stairwells and station buildings. When possible, consider parking in a structure where you will be sheltered from the elements. Please see our Service Updates page before travelling. Thanks for riding with us.
Jump to: →East
| ||||||||||||||||||||
| ||||||||||||||||||||
The entrance from the Bay Concourse to the Scotiabank Galleria will be closed Monday to Friday from 22:00 to 6:00 due to construction.Please exit via the north pedestrian bridge or the outdoor route through the Bay South Teamway.
The pick-up and drop-off area at this station is temporarily closed due to construction. Here’s what you need to know:- A temporary pick-up and drop-off area is located in the southwest parking lot.- Carpool, accessibility and reserved parking have been relocated to the northeast parking lot.- Work is expected to be completed in Sept. 2026.- Please follow all directional signage and use caution when moving around construction areas. Learn more about ongoing and upcoming construction at Milton GO.