Agencies » Minneapolis Metro

 •  METRO Blue Line

 
Stops
 

Jump to: South

Mpls-Target Field
Mall of America Station
Mall of America Crossing
30th Ave Station
Bloomington Central Station
American Blvd Station
Terminal 2 Station
Terminal 1 Station
Fort Snelling Station
VA Medical Center Station
50th St / Minnehaha Park Station
46th St Station
38th St Station
Lake St - Midtown Station
Franklin Ave Station
Cedar Riverside Station
Blue Line Rail at Green Line Rail
U.S. Bank Stadium Station
Government Plaza Station
Nicollet Mall Station
Warehouse District Hennepin Ave Station
Target Field Station Platform 1
Target Field Station Platform 2
Mall of America
Target Field Station Platform 2
Target Field Station Platform 1
Warehouse District Hennepin Ave Station
Nicollet Mall Station
Government Plaza Station
U.S. Bank Stadium Station
Cedar Riverside Station
Franklin Ave Station
Lake St Midtown Station
38th St Station
46th St Station
50th St / Minnehaha Park Station
VA Medical Center Station
Fort Snelling Station
Terminal 1 Station
Terminal 2 Station
American Blvd Station
Bloomington Central Station
30th Ave Station
Mall of America Crossing
Mall of America Station
North escalator at Blue Line Lake St - Midtown Station unavailable until further notice due to mechanical issue Started Wed Feb 26 2025
The south tower escalator is available. The elevator in the south tower is available for access between street and platform levels. Sorry for the inconvenience.
Buses will replace trains for the entire METRO Blue line beginning Monday, Sept. 22 Started Mon Sep 22 Until Sat Oct 4
ATTENTION: Starting at 10 p.m. on Monday, Sept. 22 until Saturday, Oct. 4: Replacement bus service will be available for the entire METRO Blue Line. Replacement bus timing varies and trips take longer. Please plan extra time for your trip.

The full Blue Line will be unavailable due to Phase 1 of the Track & Signals project.

NOTE: There will be no service on Blue or Green lines between U.S. Bank and Target Field stations during this closure. The Green Line will serve U.S. Bank Stadium station only, allowing customers to catch a return eastbound train to the University of MN and St. Paul or transfer to a Blue Line replacement bus further into downtown or southbound to Mall of America.

Regular service will resume for these stations on Saturday, Oct. 4.

View replacement bus stop locations and additional details at link below.

Give us feedback! Using our partner app Transit during the closure gives you the opportunity to give us real-time feedback about your experience. Hit “Go” in the app when riding a Blue Line replacement bus!

Premium tracking history reports and charts

View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.