• 61-Highway 2/Fairchild
Jump to: →East
| |||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||
Additional Stops:
Detour on Route 61 OUTBOUND from Sunset @ Rustle to Hwy 2 @ Flint (Triumph) for construction.
Detour Instructions: Sunset and Lewis
Sunset @ Windsor Stop's Closed
A-Frame at Grove.
Closed Stops: Sunset @ Lewis
Sunset @ Windsor
Alternate Stops: W SUNSET HY & S GROVE RD
Effect: Detour
Cause: : Unknown Cause
Detour on Route 61 INBOUND from Sunset @ Windsor to Sunset @ Rustle for construction.
Detour Instructions: Sunset and Lewis stop closed A-Frame to the East
Closed Stops: Sunset @ Lewis
Alternate Stops: SUNSET & LEWIS
Effect: Detour
Cause: : Unknown Cause
Detour on Route 61 INBOUND from 3rd @ Cedar to Lincoln @ 2nd for construction.
Detour Instructions: 3rd and Cedar Stop now open (11/1/26)
3rd and Jefferson has A-Frame far side
Closed Stops: 3rd @ Jefferson
Alternate Stops: W 3RD AV & MADISON
Effect: Detour
Cause: Construction
Detour on Route T 11. LOOP from Arena Bay 1 to Plaza Bay 4 for construction.
Detour Instructions: From Howard at Boone
R-Boone
L-Monroe
Resume at Mallon and Monroe
Closed Stops:
Alternate Stops:
Effect: Detour
Cause: : Unknown Cause