Agencies » Thunder Bay Transit
• 1-1
Started Tue Jun 24
Jump to: ↑North
|
|
Due to construction related detours between Victoria Ave and Dease St this stop is temporarily out of service. For more information visit service alerts at thunderbay.ca/transit Started Tue Jun 24
Notice of upcoming stop closure. Due to Cumberland St road closure for Block Party this stop will be out of service between 10:00 AM and 11:00 PM on Saturday June 28. Started Fri Jun 27 Until
Due to staffing issues the following trips are cancelled 9:03pm 1 Mainline to CH, 9:25pm 18 Westfort, 1010PM 1 Mainline to water, 10:33 pm 17 current river, 11:15 pm 1 Mainline to CH, 11:40 pm 18 Westfort Started Until
Due to staffing issues the following trips are cancelled:8:40 pm 1 Mainline to water, 9:03 pm 17 Current river, 9:48 pm 1 Mainline to CH, 10:10 18 westfort, 10:55 pm 1 Mainline to water, 11:15 pm 17 Current river Started Until
Due to Cumberland St road closure for Block Party this stop is out of service between 10:00 AM and 11:00 PM. Starts Until Sat Jun 28
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.