Agencies » Thunder Bay Transit
• 1-1
Started Until
Jump to: ↑North
|
|
Due to staffing issues the following trips are cancelled:
100 mainline to cityhall, 130 Mainline to water
200 mainline to cityhall, 230 Mainline to water
300 mainline to cityhall, 330 Mainline to water
400 mainline to cityhall, 430 Mainline to water Started Until
100 mainline to cityhall, 130 Mainline to water
200 mainline to cityhall, 230 Mainline to water
300 mainline to cityhall, 330 Mainline to water
400 mainline to cityhall, 430 Mainline to water Started Until
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.