• 4-Franklin
Route 9 Started Mon May 12 Until Wed Oct 1
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Jump to: ←West
|
|
MSS Closure Started Mon Jun 9 Until Mon Sep 1
All buses that normally use Main Street Station downstairs are relocated upstairs. Visit ridevrt.org/MSS25 for more information.
All buses that normally use Main Street Station downstairs are relocated upstairs. Visit ridevrt.org/MSS25 for more information.
MSS Closure - Route 4 Started Mon Jun 9 Until Mon Sep 1
Route 4 temporarily stops at 9th & Grove instead of Main Street Station due to construction. Visit ridevrt.org/MSS25 for more information.
Route 4 temporarily stops at 9th & Grove instead of Main Street Station due to construction. Visit ridevrt.org/MSS25 for more information.
Route 9 temp stop Started Mon Jun 9 Until Sat Jun 14
Temp stop placed far side at Inbound State & 15th
Temp stop placed far side at Inbound State & 15th
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.