Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 52-49th-Wdland to 54th-City/50th-PrkSd at Whitby Av on 54th St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:58 - 2:00 Mins
at . 0:48 ahead of Vehicle 8139 Load 97%? 54th-City

2: 21 - 29 Mins
at . 5:02 behind Vehicle 3651 Load 129%? 54th-City Last seen 3:30

3: 39 - 44 Mins
at . 1:07 ahead of Vehicle 3658 Load 69%? 54th-City

4: 1h08 - 1h18 Mins
at . 5:12 behind Vehicle 3037 Load 157%? 54th-City

Construction Started Apr 15 Until Jul 1
24/7 until 7-1-24, NB via 54th, Right on Overbrook, Left on Bryn Mawr, Left on City, Left on 54th, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.