Current time: Refresh

Agencies » Los Angeles Metro

LINE 18: Buses will start using the 6th St. bridge starting Sunday, July 17. Started Jul 17 2022 (Updated Dec 11 )

Remove ads by becoming a Premium User

 • : 18-Wilshire Western Sta-Montebello Via 6th - Whittier at Westside on Whittier going Montebello Metrolink Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 15 - 19 Mins
at . 3:37 behind Vehicle 1678 Load 302%?

2: 29 - 37 Mins
at . 4:18 behind Vehicle 1850 Load 92%?

3: 45 - 55 Mins
at . 4:43 behind Vehicle 1867 Load 156%?

4: 1h19 - 1h31 Mins
at . 9:43 behind Vehicle 6034 Load 233%? Last seen 2:39

LINE 18 detoured from Wed May 1 to Fri May 17 every from 8:00 AM to 4:00 PM due to construction. The following stops are affected: 6th between Alexandria and Normandie (Westbound) Starts May 13 Until May 17 (Updated May 11 )
Westbound: Regular route 6th St. and Kenmore Ave., then continue via 6th St., to L-Alexandria Ave., R-Wilshire Blvd., R-Normandie Ave., L-6th St., and regular route.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.