Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 52-49th-Wdland to 54th-City/50th-PrkSd at Whitby Av on 54th St going 54th-City

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 - 18 Mins
at . 6:25 behind Vehicle 3651 Load 146%? In long layover, last seen 5:34

2: 27 - 32 Mins
at . 0:21 behind Vehicle 3658 Load 74%? Last seen 2:22

3: 54 - 56 Mins
at . 1:18 behind Vehicle 3037 Load 139%? In long layover, last seen 9:22

4: 1h23 - 1h28 Mins
at . 1:04 behind Vehicle 8139 Load 159%? Last seen 1:39

Construction Started Apr 15 Until Jul 1
24/7 until 7-1-24, NB via 54th, Right on Overbrook, Left on Bryn Mawr, Left on City, Left on 54th, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.