Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 61-9th-Market to Manayunk at Clearfield St on Ridge Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 - 8 Mins
at . 5:24 behind Vehicle 3322 Load 131%? Empty Manayunk

2: 26 - 30 Mins
at . 5:14 behind Vehicle 8619 Load 69%? Manayunk

3: 35 - 45 Mins
at . 1:42 behind Vehicle 8268 Load 38%? Manayunk In long layover, last seen 1:07

4: 49 - 56 Mins
at . 2:06 behind Vehicle 8551 Load 45%? Manayunk

5: 1h23 - 1h31 Mins
at . 13:03 behind Vehicle 8535 Load 113%? Manayunk

Street Construction Started May 28 Until May 30
9:00PM to 4:00AM, SB via 8th, Left on Race, Right on 6th, Right on Walnut, Reg Rte
Construction Started Apr 3 Until Jun 7
The transit stops located at, 8th & Market discontinued, until 06-07-2024 board, passengers at 8th &, Chestnut.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.