Current time: Refresh

Agencies » Toronto TTC

This Monday through Friday, subway service on Line 1 between St Clair and Sheppard-Yonge stations will end nightly at 11 p.m. for planned track work. Shuttle buses will operate. Regular subway service will resume the following morning at 6 a.m See other service alerts. (Updated May 12 )

Remove ads by becoming a Premium User

 • : 43-Kennedy at Marilyn Ave South Side on Kennedy Rd going South to Kennedy Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 2:36 behind Vehicle 3148 Load 155%?

2: 24 Mins
at . 8:17 behind Vehicle 3299 Load 157%?

3: 43 Mins
at . 17:26 behind Vehicle 3189 Load 192%?

4: 46 Mins
at . (Sched. based) 0:00 behind Vehicle 3119

5: 53 Mins
at . 17:24 behind Vehicle 3302 Load 100%?

Vehicle 3299 on Route 43 at Passmore Ave North Side on Kennedy Rd heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.