Current time: Refresh

Agencies » Toronto TTC

Line 2 Bloor-Danforth Regular service has resumed at Pape. Started Until (Updated )
This Monday through Friday, subway service on Line 1 between St Clair and Sheppard-Yonge stations will end nightly at 11 p.m. for planned track work. Shuttle buses will operate. Regular subway service will resume the following morning at 6 a.m. See other service alerts. (Updated May 24 )

Remove ads by becoming a Premium User

 • : 43-Kennedy at Shropshire Dr North Side on Kennedy Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:13 Mins
at . 0:27 behind Vehicle 3111 Load 185%? 43A North to Steeles

2: 6 Mins
at . 3:52 ahead of Vehicle 3233 Load 85%? 43A North to Steeles

3: 11 - 13 Mins
at . 2:42 ahead of Vehicle 3318 Load 63%? 43B North to Scarborough Centre

4: 19 Mins
at . 0:47 ahead of Vehicle 3187 Load 134%? 43A North to Steeles

5: 27 - 30 Mins
at . 2:51 ahead of Vehicle 3128 Load 119%? 43A North to Steeles

Vehicle 3318 on Route 43 aprchg Kennedy Station - Platform B heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.