Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Vermont / Athens Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 - 9 Mins
at . 1:09 behind Vehicle 1194-1203 Load 96%?

2: 26 - 31 Mins
at . 1:14 behind Vehicle 1187-1205 Load 82%?

3: 46 - 49 Mins
at . 1:16 behind Vehicle 309 Load 125%?

4: 1h06 - 1h09 Mins
at . 1:15 behind Vehicle 1188-1196 Load 125%?

5: 1h26 - 1h29 Mins
at . 0:50 behind Vehicle 1183-1191 Load 122%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.