Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Vermont / Athens Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 - 11 Mins
at . 2:46 behind Vehicle 1187-1205 Load 101%?

2: 23 - 27 Mins
at . 1:55 behind Vehicle 1195-1197 Load 95%?

3: 39 - 44 Mins
at . 3:19 behind Vehicle 1188-1196 Load 109%?

4: 55 - 59 Mins
at . Waiting 5:08. 2:17 behind Vehicle 1183-1191 Load 94%? Last seen 5:08

5: 1h11 - 1h14 Mins
at . 1:50 behind Vehicle 1189-1207 Load 97%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.