Current time: Refresh

Agencies » Halifax Transit

Remove ads by becoming a Premium User

 • : 39-Flamingo at Carrington Pl on Parkland Dr going 39 Bridge Terminal Via Mackay Bridge

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 17 - 23 Mins
at . 6:15 behind Vehicle 1377 Load 83%?

2: 50 - 59 Mins
at . 7:56 behind Vehicle 1199 Load 106%?

3: 1h16 - 1h25 Mins
at . 3:40 behind Vehicle 1366 Load 84%?

Stop closure Pinecrest Dr After Brule St (7451) is closed for construction Started Thu Aug 22 Until Wed Jan 1 3000
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.