Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Aviation / LAX Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 4 Mins
at . 1:05 behind Vehicle 1188-1196 Load 91%?

2: 18 - 23 Mins
at . 2:08 behind Vehicle 1202-1204 Load 100%?

3: 36 - 52 Mins
at . 5:37 behind Vehicle 1194-1208 Load 122%?

4: 50 - 57 Mins
at . 1:25 behind Vehicle 1200-1206 Load 74%?

5: 1h06 - 1h13 Mins
at . 2:11 behind Vehicle 1195-1197 Load 105%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.