Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at El Segundo Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 Mins
at . 8:48 behind Vehicle 1202-1204 Load 127%?

2: 15 - 17 Mins
at . 1:12 behind Vehicle 1194-1208 Load 52%?

3: 31 - 37 Mins
at . Waiting 9:45. 2:57 behind Vehicle 1200-1206 Load 116%?

4: 47 - 52 Mins
at . 2:44 behind Vehicle 1195-1197 Load 99%?

5: 1h04 - 1h24 Mins
at . 5:21 behind Vehicle 1188-1196 Load 116%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.