Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Mariposa Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 7 Mins
at . 1:03 behind Vehicle 1194-1208 Load 50%?

2: 19 - 26 Mins
at . 0:01 ahead of Vehicle 1200-1206 Load 127%?

3: 40 - 48 Mins
at . 5:20 behind Vehicle 1195-1197 Load 133%?

4: 53 - 1h00 Mins
at . 2:32 behind Vehicle 1188-1196 Load 82%?

5: 1h13 - 1h21 Mins
at . 6:32 behind Vehicle 1202-1204 Load 125%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.