Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Hawthorne / Lennox Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 1:14 behind Vehicle block_304_schedBasedVehicle Load 106%? Last seen 5:57

2: 24 Mins
at . 0:37 ahead of Vehicle block_305_schedBasedVehicle Load 73%?

3: 47 - 55 Mins
at . 7:12 behind Vehicle 1194-1208 Load 111%?

4: 1h24 - 1h27 Mins
at . 0:17 behind Vehicle 1188-1196 Load 132%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.