• : Metro C Line at Willowbrook - Rosa Parks Station - Metro C-Line going
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 10 - 13 Mins
at . 0:20 behind Vehicle 302
2: 43 Mins
at . 1:45 behind Vehicle block_303_schedBasedVehicle Load 105%?
3: 1h09 Mins
at . 3:22 behind Vehicle block_304_schedBasedVehicle Load 89%?
C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )
Add stop (different agency)