Current time: Refresh

Agencies » Kitchener-Waterloo GRT

Remove ads by becoming a Premium User

 • : 58-Elgin North at Hespeler Rd. on Bishop going Cambridge Centre Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 Mins
at . 0:05 ahead of Vehicle 22002 Load 94%?

2: 39 Mins
at . 0:05 ahead of Vehicle 22005 Load 100%?

3: 1h09 Mins
at . 0:00 behind Vehicle 22001 Load 100%?

Route 50 Dundas-Myers leaving Ainslie Terminal on September 25, 2024 at 10:45 a.m. towards Cambridge Centre Station is cancelled between Ainslie Terminal (#1517) and Delta Station (#1612). Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.