Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 20-Victoria/Downtown at Bay 3 on Commercial-Broadway Station going 20 Downtown

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 14 Mins
at . 1:29 behind Vehicle 2567 Load 94%?

2: 20 - 27 Mins
at . 0:16 ahead of Vehicle 2562 Load 83%?

3: 37 - 54 Mins
at . 8:59 behind Vehicle 2566 Load 162%?

4: 1h22 - 1h34 Mins
at . 4:55 behind Vehicle 2545 Load 259%? Last seen 2:12

Stop 50931 Eastbound W Hastings St @ Homer St is temporarily closed from Fri Jun 14 through Fri Jun 28 all day and daily due to construction. Started Jun 14 Until Jun 29
More...
Stop 50930 Eastbound W Hastings St @ Seymour St is temporarily closed from Thu Jun 27 to Fri Jun 28, 10am-3pm daily, due to construction. Starts Jun 27 Until Jun 28
Update: 20 Victoria trip leaving Southbound Richards St @ Dunsmuir St at 11:35am is cancelled today due to mechanical issue. Resume from Commercial-Broadway Stn Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.