Current time: Refresh

Agencies » Seattle King County Metro

Remove ads by becoming a Premium User

 • : E-Line Rapid Ride at N 80th St on Aurora Ave N going Aurora Village Transit Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 - 18 Mins
at . 3:34 behind Vehicle 6203 Load 185%? Last seen 1:09

2: 13 - 18 Mins
at . 18:15 behind Vehicle 6222 Load 9%? Last seen 1:16

3: 44 - 1h02 Mins
at . 10:47 behind Vehicle 6202 Load 263%? Last seen 1:20

4: 1h13 - 1h26 Mins
at . 6:29 behind Vehicle 8155 Load 190%? Last seen 1:18

RapidRide E Line to Seattle will be rerouted and will not serve Stop #510 on S Washington St at 3rd Ave S from Monday, September 23 through Friday, September 27, at all times, due to construction. Started Mon Sep 23 Until Sat Sep 28
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.