Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 0:00 behind Vehicle 1641 Platform 2 Leppington In long layover, last seen 1:02:03

2: 10 Mins
at . 23:31 behind Vehicle 4983.5320.3492.2804 Load 33%? Platform 2 Leppington Last seen 1:47

3: 14 Mins
at . 11:01 behind Vehicle 4182.8884.2101.6118.7067.2554.8937.6979 Load 15%? Many Seats Platform 2 Leppington Last seen 1:17

4: 26 Mins
at . 0:00 behind Vehicle 2670 Load 52%? Platform 2 Leppington In long layover, last seen 32:09

5: 27 Mins
at . 1:18 behind Vehicle 1698.9550.8212.1968.9412.4506.4262.4950 Load 6%? Many Seats Platform 2 Leppington

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Vehicle 5426 aprchg Blacktown Station heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.