Current time: Refresh

Agencies » Halifax Transit

9A Greystone Inbound is on detour due to Construction in the area Started Jun 9 Until Jan 1 3000
More...
9A Greystone Outbound is on detour due to Construction in the area Started Jun 17 Until Jan 1 3000
More...
9A Greystone Inbound is on detour due to Construction in the area Started Jun 17 Until Jan 1 3000
More...

Remove ads by becoming a Premium User

 • : 9A-Greystone at Queen St on Spring Garden Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . 28:08 behind Vehicle 1210 Load 172%? 9a Downtown Via Spring Garden

2: 12 Mins
at . 6:02 behind Vehicle 1155 Load 59%? 9a Downtown Via Spring Garden

3: 37 Mins
at . 0:00 behind Vehicle 1213 Load 83%? 9a Downtown Via Spring Garden

4: 1h06 Mins
at . 0:00 behind Vehicle 739 Load 97%? 9a Downtown Via Spring Garden

Stop closure Bell Rd After Robie St (6291) is closed for construction Started Mar 11 Until Jan 1 3000
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.