Current time: Refresh

Agencies » Fort Wright TANK

The Dixie Hwy/Florence I Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29
The Dixie Hwy/Florence O Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29

Remove ads by becoming a Premium User

 • : 1-Dixie Hwy/Florence at Fort Mitchell on Dixie going Florence

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 22 Mins
at . 0:38 behind Vehicle 2189 Load 197%?

2: 53 Mins
at . 1:46 behind Vehicle 2231 Load 104%?

3: 1h21 Mins
at . Waiting 6:40. 0:00 behind Vehicle 2194 Load 94%?

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.