• : 39-Flamingo at Ranya Ln on Boland Rd going →39 Bridge Terminal Via Mackay Bridge
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
Stop closure Pinecrest Dr After Brule St (7451) is closed for construction Started Thu Aug 22
Until Wed Jan 1 3000
Stop Closure Notice:
Route: 39 Flamingo Outbound
Location: Pinecrest Dr After Brule St (7451)
Cause: Stop Closed Construction
Affected Stops:
Pinecrest Dr After Brule St (7451)More... Add stop (different agency)