Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Toongabbie Station going Leppington

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 2:17 behind Vehicle 5040 Platform 1 In long layover, last seen 26:03

2: 8 Mins
at . 4:27 behind Vehicle 9407.9331.2183.7402.3962.1794.8517.9693 Load 7%? Many Seats Platform 1

3: 26 Mins
at . 0:01 behind Vehicle 2854.3932.7316.9643.5686.1167.1334.3991 Load 62%? Platform 1

4: 1h04 Mins
at . 1:27 behind Vehicle 4377 Load 125%? Platform 1 In long layover, last seen 48:00

5: 1h05 Mins
at . 2:33 behind Vehicle 5140.7575.8813.6060 Load 4%? Platform 1 Last seen 1:27

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.