Current time: Refresh

Agencies » Fort Wright TANK

The Dixie Hwy/Florence I Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29
The Dixie Hwy/Florence O Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29
The NULL Route(s) will operate Detour as the result of Construction starting 6/17/2024. Started Jun 16 Until Jun 20

Remove ads by becoming a Premium User

 • : 1-Dixie Hwy/Florence at Fort Mitchell on Dixie going Florence

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 12 - 17 Mins
at . 3:05 behind Vehicle 2206 Load 109%? Empty

2: 41 Mins
at . 0:00 behind Load 90%?

3: 1h11 Mins
at . 0:00 behind Load 100%?

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.