Current time: Refresh

Agencies » Halifax Transit

Remove ads by becoming a Premium User

 • : 39-Flamingo at Langbrae Dr on Parkland Dr going 39 Bridge Terminal Via Mackay Bridge

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 11 Mins
at . Waiting 9:35. 0:40 behind Vehicle 1235 Load 101%?

2: 39 - 42 Mins
at . 0:28 behind Vehicle 1259 Load 99%?

3: 1h09 - 1h12 Mins
at . 0:11 behind Vehicle 1202 Load 99%?

Stop closure Pinecrest Dr After Brule St (7451) is closed for construction Started Thu Aug 22 Until Wed Jan 1 3000
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.